Current Status #1

September 2, 2017 at 8:03 pm

An update on where the Fusor is at:   Nearly done, honestly.  A handful of jobs to do prior to completion.  Main ones:  I’ve to finish ordering deuterium, and arrange a high voltage power supply.  Once they’re here, they’ve to be installed and then I’m set to go.  I’ve got […]

Vacuum Gauge Data

July 19, 2017 at 1:55 pm

One of the main features of the Fusor is remote operation, or as close to that as is possible without a huge amount of extra work.  I should be able to operate the Fusor without having to reach in and physically adjust or observe anything directly i.e. operate it while […]

Irregular Gaskets

June 30, 2017 at 3:27 pm

I ran into a bit of trouble recently with an irregularly sized conflat port, still working through it: In pulling a vacuum in a chamber, it must be sealed from the surrounding atmosphere/air. Otherwise the outside air will keep rushing in (a leak) as the vacuum pump(s) work and there’ll […]